TAV High Speed Train Station

1 2 3 4 5 6 7


The project concerns with the foundations structures for the projecting roofs covering the railway platforms within the main project (signed by Zaha Hadid) for the construction of the High-Speed Train Station “Campania- Afragola” along the railroad connecting Rome to Naples.

The projecting roofs covering the rail platforms develop along them for a variable length between 410m and 220m. The structures of the piles (800) foundations have a variable length in order to be clamped in the bedrock for a depth of 4m at least.