Maghnia Pipeline

1 2 3 4 5


Project and executive direction for the building of a feeding pipeline of the hammam Boughrara Dam towards the city of Maghnia, Algeria.
The new feeding water system consists of a new pipeline
(12km – DN700 ductile iron – 50000cm/d), starting from Hammam Boughrara Dam, towards Maghnia.
The system is composed by two main reservoirs (20000 cm total capacity) and two pumping station with balancing reser-voirs (4000 cm). CUSTOMER: Società Italiana Condotte d’Acqua SPA – (Italy)