Drainage Tunnel “Casanova”
The project includes the functionality maintainance check and the safety procedures for the drainage of Casanova dam on the Chiascio river. In particular, the retaining structures aimed to the enlarge-ment of the artificial drainage tunnel have been analyzed. The artificial tunnel is contained between two bulkheads of piers (1200) and concrete beams on the top, with a 3.90 m pitch, while they are clamped in the bedrock on the bottom.